- Suzlon Secures 170MW Wind Energy Project in Andhra Pradesh: A Milestone in India’s Renewable Energy Journey
- Introduction
- Project Overview: Suzlon’s 170MW Wind Energy Project
- Location and Scope
- Client and Execution Timeline
- Suzlon’s Role in India’s Renewable Energy Sector
- Company Background
- Technological Innovation
- India’s Renewable Energy Landscape
- Government Targets and Policies
- Andhra Pradesh: A Renewable Energy Hub
- Economic and Environmental Impact
- Job Creation and Local Development
- Carbon Emission Reduction
- Case Studies: Suzlon’s Previous Successes
- Jaisalmer Wind Park, Rajasthan
- Dhule Wind Farm, Maharashtra
- Challenges and Opportunities
- Grid Integration and Storage
- Financing and Investment
- Future Outlook
- Scaling Up Capacity
Suzlon Secures 170MW Wind Energy Project in Andhra Pradesh: A Milestone in India’s Renewable Energy Journey

Introduction
India’s renewable energy sector has witnessed significant growth over the past decade, driven by ambitious government targets, technological advancements, and increasing private sector participation. Among the key players in this transformation is Suzlon Energy Ltd., one of India’s leading renewable energy solutions providers. In a major development, Suzlon recently secured a 170-megawatt (MW) wind energy project in Andhra Pradesh, marking a significant step forward in the country’s clean energy ambitions. This article delves into the details of the project, its implications for the renewable energy landscape, and Suzlon’s pivotal role in shaping India’s green future.
Project Overview: Suzlon’s 170MW Wind Energy Project
Location and Scope
The 170MW wind energy project is set to be developed in Andhra Pradesh, a state known for its favorable wind conditions and proactive renewable energy policies. The project will involve the installation of 81 wind turbine generators (WTGs), each with a capacity of 2.1MW, from Suzlon’s S120 – 140m series. These turbines are designed to maximize energy output even in low-wind conditions, making them ideal for the region’s wind profile.
Client and Execution Timeline
The project has been awarded by a leading Indian power utility, although the client’s name has not been publicly disclosed. Suzlon will be responsible for the entire project lifecycle, including supply, installation, commissioning, and post-commissioning operations and maintenance services. The project is expected to be commissioned in phases, with completion targeted within the next 18 to 24 months.
Suzlon’s Role in India’s Renewable Energy Sector
Company Background
Founded in 1995, Suzlon Energy Ltd. has been a pioneer in India’s wind energy sector. Headquartered in Pune, the company has installed over 19.4GW of wind energy capacity across 17 countries. In India alone, Suzlon has a market share of over 33% in the wind energy segment, making it one of the most influential players in the industry.
Technological Innovation
Suzlon’s success can be attributed to its focus on innovation and indigenization. The company’s S120 – 140m wind turbine series, which will be used in the Andhra Pradesh project, is a testament to its engineering prowess. These turbines feature a rotor diameter of 120 meters and a hub height of 140 meters, enabling them to capture more wind and generate higher energy output. Additionally, Suzlon’s turbines are designed to be modular and scalable, allowing for easier transportation and installation in remote areas.
India’s Renewable Energy Landscape
Government Targets and Policies
India has set an ambitious target of achieving 500GW of non-fossil fuel capacity by 2030, as part of its commitment under the Paris Agreement. As of 2023, the country has already installed over 120GW of renewable energy capacity, with wind energy accounting for approximately 44GW. The government has introduced several policy measures to support this growth, including:
- Renewable Energy Certificates (RECs)
- Viability Gap Funding (VGF)
- Accelerated Depreciation Benefits
- Green Energy Corridors for efficient transmission
Andhra Pradesh: A Renewable Energy Hub
Andhra Pradesh has emerged as a key player in India’s renewable energy sector, thanks to its favorable geography and supportive state policies. The state has a renewable energy potential of over 58GW, including 44GW from solar and 14GW from wind. It has already commissioned over 8GW of renewable energy projects and is actively pursuing new investments to meet its clean energy goals.
Economic and Environmental Impact
Job Creation and Local Development
The 170MW wind project is expected to generate significant employment opportunities during both the construction and operational phases. According to industry estimates, every megawatt of wind energy capacity creates approximately 15-20 direct and indirect jobs. This means the project could create over 2,500 jobs, contributing to local economic development in Andhra Pradesh.
Carbon Emission Reduction
Wind energy is one of the cleanest sources of power generation, with zero greenhouse gas emissions during operation. The 170MW project is expected to generate approximately 450 million units of electricity annually, which can power around 1.5 lakh households. More importantly, it will help offset nearly 0.4 million tonnes of CO₂ emissions each year, contributing to India’s climate change mitigation efforts.
Case Studies: Suzlon’s Previous Successes
Jaisalmer Wind Park, Rajasthan
One of Suzlon’s flagship projects is the Jaisalmer Wind Park in Rajasthan, which has a total installed capacity of over 1,600MW. It is one of the largest wind farms in India and showcases Suzlon’s ability to execute large-scale projects in challenging terrains. The park has significantly contributed to Rajasthan’s renewable energy portfolio and serves as a model for future developments.
Dhule Wind Farm, Maharashtra
Another notable project is the Dhule Wind Farm in Maharashtra, with an installed capacity of 217MW. This project was completed in record time and has been instrumental in stabilizing the local grid. It also features Suzlon’s advanced turbine technology, which has improved energy yield and reduced maintenance costs.
Challenges and Opportunities
Grid Integration and Storage
One of the major challenges facing India’s wind energy sector is grid integration. The intermittent nature of wind power can lead to grid instability, especially during peak demand periods. To address this, the government is investing in energy storage solutions and smart grid technologies. Suzlon is also exploring hybrid models that combine wind, solar, and storage to ensure a more stable power supply.
Financing and Investment
While the renewable energy sector has attracted significant investment, financing remains a challenge due to high upfront costs and long payback periods. However, initiatives like green bonds, international climate finance, and public-private partnerships are helping bridge the funding gap. Suzlon’s ability to secure large projects like the one in Andhra Pradesh demonstrates investor confidence in its capabilities and the sector’s long-term viability.
Future Outlook
Scaling Up Capacity
With the successful execution of the Andhra Pradesh project, Suzlon is well-positioned to scale up its operations and contribute more significantly to India’s renewable energy targets. The company is also exploring opportunities in offshore wind, which has a potential of over 70