Local sun, utility rules, permits and installers

Sacramento has about 1,530 kWh a year per kW of rooftop solar (our estimate). Your utility decides what exported power earns, so see the rules for SMUD below, then get quotes.

Sacramento solar at a glance

Estimate1,530 kWhOutput per kW per year in SacramentoOur estimate from NASA POWER sunshine (5.23 kWh per square meter per day).
State$2.52 a wattCalifornia average installed priceEnergySage, October 2026. Not a Sacramento quote.
StateEnds 2026State solar property-tax exclusionSystems finished before Jan 1, 2027 keep the exclusion until the home changes owners (SB 710, 2025).
StateEndedFederal solar credit (25D)Not allowed after December 31, 2025 (IRS).

Utility rules and programs for Sacramento

SMUD serves homes in Sacramento.

UtilityTypeSolar export rule
Sacramento Municipal Util Distpublic powerSMUD’s Solar and Storage Rate pays 9.6 cents per kWh for exported power at any time of day since June 1, 2026. Systems may be sized up to 110 percent of last year’s use, or 120 percent with a battery.

Program details are from each utility’s own pages (read October 2026). See the California incentives table for statewide credits and a status for every program.

Permits and approvals in Sacramento

  • Community Development Department, Building Division: permit information
  • Residential solar permits go through SolarAPP+ for one- and two-unit homes, then the contractor applies in the city’s Public Permit Portal with the SolarAPP+ approval ID. Only licensed contractors submit through SolarAPP+.
  • The utility must approve the connection before you switch on: SMUD solar for your home · your own utility’s interconnection page.
  • Check any contractor on the CSLB license check before you sign.
  • California law (Civil Code 714) voids HOA rules that effectively ban solar, though an association can impose reasonable restrictions; an application not denied in writing within 45 days is deemed approved.

Fees and steps change; confirm with the office before you start. We have not verified timelines for Sacramento.

Costs and savings

We do not have verified installed prices for Sacramento alone. The California figures above show what to expect; real quotes depend on your home, equipment and installer. Try the solar savings calculator, and get at least two written quotes.

Choosing an installer

  • License: check the contractor on the CSLB license check and that the license covers this work.
  • Quote: ask for an itemized written quote that names the equipment, warranties and who pulls the permit and handles the utility approval.
  • Compare: get two or three quotes and compare them line by line, not only the total.

Get solar quotes in Sacramento

Tell us about your project in Sacramento. We reply ourselves and match you with a licensed installer who serves your area. It is free, with no obligation, and nothing is shared with an installer unless you choose one.

More for Sacramento

Home Battery Installation in Sacramento · Backup Generator Installation in Sacramento · Home EV Charger Installation in Sacramento · Sacramento energy guide · California energy guide.

Solar Panel Installation in Sacramento FAQs

Is solar worth it in Sacramento?

The sun is strong (about 1,530 kWh a year per kW, our estimate), but export credits are low, so solar pays most when sized to what you use at home or paired with a battery. See the California incentives for the state credit.

Is there a federal solar tax credit in 2026?

No. The federal 25D credit ended for expenditures after December 31, 2025. California has no state solar tax credit that we found; the state property-tax exclusion applies to systems finished before January 1, 2027.

Do I need a permit for solar panels in Sacramento?

Usually yes, and the utility may need to approve solar and batteries. Community Development Department, Building Division handles permits in Sacramento; see the permit information above.

How do I find a licensed installer in Sacramento?

Use the quote button on this page. We reply ourselves and match you with a licensed installer who serves your area; you can check any contractor on the CSLB license check.

Sources: sunshine and climate NASA POWER; hazards FEMA National Risk Index; utility numbers EIA-861 (2024); prices EnergySage (October 2026) and Generac (U.S.); credits IRS and California SB 710 (2025); permit information from the city or town’s own page; utility programs from each utility’s own pages (October 2026). General information, not financial, tax, legal or electrical advice. See our editorial policy.

Where to buy

Amazon shows many brands. Use the checklist to compare them.

What to check before you buy:

  • Rated watts and connector type match your power station
  • Folding panels: weight and weather rating are listed
  • Reviews from people using it for the same job
Browse solar panels on AmazonAs an Amazon Associate we earn from qualifying purchases. Read our affiliate disclosure.