Cleveland, Ohio Energy Guide: Solar, Batteries, Generators & EV Charging

Cleveland downtown skyline with the Terminal Tower and the Cuyahoga River bridge
Cleveland energy guide

Cleveland, Ohio

Your complete local energy guide: electricity rates, solar panels, home batteries, generators, and EV charging. Compare costs, incentives, permits, and find local installation professionals.

Average kWh price
16.76¢Cleveland Electric Illum36thcheapest state of 51
14.87¢Cleveland Public Power36thcheapest state of 51
Yearly outage time
150 minCleveland Electric Illum32ndfewest outage minutes, state
170 minCleveland Public Power32ndfewest outage minutes, state

Your complete Cleveland energy guide

Everything you need to find and understand about energy in Cleveland: what electricity costs, who supplies it, and how solar, home batteries, generators and EV charging fit your home, with local incentives, permits and where to start.

How can we help you?Pick what matters to you, then press Go.
Find Stations Near YouE85LPGCNG

Cleveland energy dashboard

General information

What every Cleveland home deals with, whatever you install
City740 | 5,970Cooling | heating degree-days a yearBase 65°F, NASA POWER; about 730 feet above sea level.
Estimate1,060 kWhRooftop solar output per kW per yearOur estimate from NASA POWER sunshine: 3.63 kWh per square meter per day on average.
CountyVery HighTop hazard: cold wavesFEMA National Risk Index for Cuyahoga County.
USEndedFederal home energy credits25D (solar, batteries) after 12/31/2025; 30C (chargers) after 6/30/2026

What this means for your home

Short answers, from the local numbers
Why might my bill be high?

Heating and cooling. Cleveland has about 5,970 heating degree-days and 740 cooling degree-days a year (NASA POWER, base 65°F), at about 730 feet. Insulate and seal the attic and ducts, service the heating system, and ask your utility about time-of-use plans.

Ohio electricity costs →
Is solar worth it here?

Rooftop solar in Cleveland makes roughly 1,060 kWh a year per kW of panels (our estimate from NASA POWER sunshine of 3.63 kWh per square meter per day). Export rules differ by utility (see the table below). Size solar to what you use at home, or pair it with a battery.

Ohio incentives →
What if the power goes out?

Cold waves raise demand and can cause both outages and frozen pipes. Keep at least one room warm with a battery-run heater circuit or a generator. FEMA rates Cuyahoga County cold waves “very high”.

Get a quote →
Where can I charge an electric car?

Cleveland has 176 public ports at 66 locations, 31 of them DC fast (AFDC, October 2026). Home charging does most of the work.

EV charging stations in Cleveland →
How do I get a quote?

Tell us your project and your city and we match you with a licensed installer who serves your area. It is free, with no obligation.

Request a quote →

Tags show the scope of each number: Cleveland, a whole utility, Ohio, or the U.S. Data checked October 21, 2026; sources are listed at the bottom. Utility figures are for the whole utility, not Cleveland alone. The numbers for each solution are in its own section below, in its own color: solar yellow, battery green, generator red, EV purple.

How we rank: price and outage ranks compare Ohio with the other states and D.C. (EIA Electric Power Monthly, July 2026; EIA-861 reliability reports, 2024). Sun: NASA POWER. Public charging: AFDC, October 2026.

Cleveland electricity providers

Do not assume every Cleveland home has the same provider. Cleveland Electric Illum and Cleveland Public Power serve different parts of Cuyahoga County. Check the top of your bill, or ask the utility with your address.

Ohio is a retail-choice state: your local utility delivers power and keeps the lines working, but you can buy the supply part from a competitive supplier or stay on the utility’s standard service offer. Compare offers on the PUCO Energy Choice site, watch for teaser rates, and if you have solar ask whether the supplier offers net metering.

  • Type: investor-owned.
  • Home customers (2024): 131,370.
  • Price: 16.76 cents per kWh on average, utility-wide (EIA-861).
  • Outage minutes (2024): 150 normal days, 1,918 with major events.
  • Solar export: The Illuminating Company is part of FirstEnergy and uses the same Net Energy Metering Rider: excess energy is credited at the generation component of your rate schedule. Residential systems up to 25 kW use the Level 1 application.
  • Programs: FirstEnergy’s FAQ says there are currently no company rebates or incentives for customer-owned generation.

Program details are from each utility’s own pages, read October 2026; we have not verified anything we do not state. Statewide: Ohio utilities.

Cleveland electricity rates and average bills

Your bill in Cleveland has a regulated delivery charge set in PUCO rate cases and a supply charge from the standard service offer or a competitive supplier you choose. Delivery charges are being reset for 2026 and 2027, so ask your utility what changes are coming.

UtilityPrice we confirmed
Cleveland Electric Illum16.76 cents per kWh, utility-wide average, 2024 (EIA-861)
Cleveland Public Power14.87 cents per kWh, utility-wide average, 2024 (EIA-861)

Ohio average residential price, July 2026: 19.45 cents per kWh (EIA Electric Power Monthly, preliminary), against 18.31 for the U.S. This state number is not a price for Cleveland alone.

Why electricity bills are high in Cleveland

  • Heating. Cleveland has about 5,970 heating degree-days a year (NASA POWER, base 65°F), so heating is the big load.
  • Winter heating. Cold winters mean electric heat and heat pumps drive the biggest bills; weatherizing helps most.
  • Rate changes. Delivery charges are being reset in rate cases, and supplier teaser rates can jump after the introductory period.
  • Your plan and your home. The rate plan, the size and age of the house, and when you use power all change the bill; compare plans before you assume the price is fixed.

Most of this is cooling or heating and timing, which means a lot of it can be changed. See our guide to what uses the most electricity, and the next section.

How to lower your electric bill in Cleveland

  1. Check your rate plan. Ask about time-of-use plans (AEP Ohio offers one with a smart meter) and compare supplier offers at the PUCO Energy Choice site before switching.
  2. Move big loads out of the peak. Run the dishwasher, laundry and EV charging when power is cheapest on your plan.
  3. Attack heating and cooling first. Shade windows, seal and insulate the attic and ducts, service the air conditioner and use a smart thermostat.
  4. Pick efficient equipment. See our guide to lowering your electric bill.
  5. Size solar to your own use. It saves the most on power you use at home; see the solar section below.
  6. Add a battery if exports pay little. It moves midday power into the evening peak.
  7. Charge an EV cheaply. Use the cheap hours on your plan.

We have not put dollar savings on these steps because they depend on your home and plan. Use the calculators in the cost section to test your own numbers.

Power outages and backup power in Cleveland

In 2024 the average Cleveland Electric Illum customer lost 150 minutes of power in a normal year (1,918 with major events; EIA-861, whole utility). FEMA rates the biggest risks in Cuyahoga County as: cold waves (very high); tornadoes (very high); river and heavy-rain flooding (relatively high).

  • Cold waves (very high): Cold waves raise demand and can cause both outages and frozen pipes. Keep at least one room warm with a battery-run heater circuit or a generator.
  • Tornadoes (very high): Tornado-season storms cut power quickly. A battery that switches on by itself, or a portable generator ready to go, covers the first night; sirens and weather radios need power too.
  • River and heavy-rain flooding (relatively high): Heavy rain can flood basements and take out power. Put sump pumps on backup power and keep equipment above the flood line.
Backup optionBest forGuide
Portable power stationPhones, internet, a fan and small medical devicesPower stations
Home batterySilent, automatic backup; works with solarCleveland battery guide
Standby generatorMulti-day outages and central air conditioningCleveland generator guide

See also our backup power guide.

Solar panels in Cleveland

About 1,060 kWh a year from each kW of rooftop panels here (our estimate). Under Ohio’s net metering rule, exports earn a credit at the energy part of your supply price and roll forward on your bill; ask your utility for the exact rate.

  • Permits come from City of Cleveland Department of Building and Housing; the utility must approve the connection before you switch on.

Info about Solar Panel Installation in ClevelandGet solar quotes

Estimate1,060 kWhOutput per kW per year in ClevelandOur estimate from NASA POWER sunshine (3.63 kWh per square meter per day).
State$2.58 a wattOhio average installed priceEnergySage, October 2026. Not a Cleveland quote.
StateNoneState solar tax creditWe found no Ohio state solar income-tax credit or rebate. Sales-tax and property-tax treatment for homes is not confirmed; ask your installer.
StateEndedFederal solar credit (25D)Not allowed after December 31, 2025 (IRS).

Home batteries in Cleveland

A battery keeps the essentials running in an outage and moves midday power into the expensive evening peak. Heat limits where it can go, and local permits apply.

  • It earns the most where evening power costs more than midday power or where a utility pays for sharing it.

Info about Home Battery Installation in ClevelandGet battery quotes

State$16,900Ohio average, 13 kWh batteryEnergySage, before incentives. Not a Cleveland quote.
State740Cooling degree-days a yearHeat limits where a battery can go; keep it out of direct afternoon sun.
Utility150 minTypical outage time, Cleveland Electric Illum2024, utility-wide, normal days (EIA-861).
StateEndedFederal battery credit (25D)Not allowed after December 31, 2025 (IRS).

Backup generators in Cleveland

A standby generator runs as long as it has fuel, which suits multi-day storms and big loads like central air conditioning. A transfer switch keeps it from feeding power back to the grid.

  • Natural gas or propane: a propane tank may need its own permit.

Info about Backup Generator Installation in ClevelandGet generator quotes

State$8,000-16,000Typical installed costGenerac statement, a U.S. figure, including the generator.
StateVery HighTop hazard: cold wavesFEMA National Risk Index for Cuyahoga County.
UtilityRequiredTransfer switchIt keeps backup power from feeding the grid; ask your utility for its rules.
Utility1,918 minOutage time with major stormsCleveland Electric Illum, 2024, utility-wide (EIA-861).

EV chargers in Cleveland

Most charging happens at home on a Level 2 charger, and your rate plan decides what it costs.

  • A licensed electrician installs it, usually with a permit.

Info about Home EV Charger Installation in ClevelandGet EV charger quotes

State$800-3,000Typical U.S. install, before chargerEnergySage, June 2026; no Texas average is published. Not a Cleveland quote.
State176 portsPublic charging in Cleveland66 locations, 31 DC fast (AFDC, October 2026).
StateEndedFederal charger credit (30C)Not allowed after June 30, 2026 (IRS).
StateLevel 2Home chargingA 240-volt circuit installed by a licensed electrician, with a permit where required.

Find fueling and charging stations in Cleveland

Looking for a charger or a fuel pump near you? Each card below opens its own page, with a map that starts on Cleveland, the station counts, the price of the fuel, how it compares with the others, and what to know before you go. Station data: U.S. Department of Energy, read 2026-10-22.

Not on the map, or something wrong? Submit a new station or report a change to the U.S. Department of Energy, which runs the map.

Cleveland energy system costs and savings

We could not find verified installed prices for Cleveland alone, so these are the closest sourced figures, labeled by where they come from. Real quotes depend on your home, equipment and installer.

SolutionTypical cost (source)What it can saveTry the calculator
Solar panels$2.58 a watt in Ohio (EnergySage, October 2026); about $15,480 for a 6 kW system (our arithmetic)Each kW makes about 1,060 kWh a year (our estimate); used at home it saves your retail price per kWhSolar savings
Home batteryAbout $16,900 for 13 kWh in Ohio (EnergySage, before incentives)Moves cheap midday or night power into the expensive evening; some utilities pay for sharing itBattery sizing
Standby generator$8,000 to $16,000 installed incl. generator (Generac, U.S.)No savings; avoids losses in outagesGenerator sizing
EV chargerAbout $800 to $3,000 before the charger (EnergySage, U.S. range)Charging at home costs less than most public fast chargingEV charging cost

Each guide has a calculator built for Cleveland: solar, battery, generator and EV.

Rebates, tax credits and financing in Ohio (checked October 21, 2026)

ProgramStatusWhat we confirmedSource
Federal Residential Clean Energy Credit (25D): solar and batteriesENDEDNot allowed for expenditures after December 31, 2025; solar or a battery finished in 2026 gets nothing.IRS
Federal charger credit (30C)ENDEDNot allowed for chargers placed in service after June 30, 2026.IRS
Federal EV purchase credit (30D)ENDEDNot allowed for vehicles acquired after September 30, 2025.IRS
Ohio net metering (OAC 4901:1-10-28)ACTIVEInvestor-owned utilities credit exports at the energy part of the standard service offer, system up to 120 percent of useOhio Administrative Code 4901:1-10-28
Ohio sales and property tax on home solarNOT CONFIRMEDConsumer guides report exemptions, but we could not confirm how they apply to a homeSolarReviews (secondary)
Cleveland Electric Illum: solar and programsCHECKThe Illuminating Company is part of FirstEnergy and uses the same Net Energy Metering Rider: excess energy is credited at the generation component of your rate schedule. Residential systems up to 25 kW use the Level 1 application. FirstEnergy’s FAQ says there are currently no company rebates or incentives for customer-owned generation.See the utility’s own pages
Cleveland Public Power: solar and programsCHECKCleveland Public Power is a city utility, not covered by the PUCO net metering rule as far as we could confirm; we did not verify its export terms, so ask before you sign. We found no verified Cleveland Public Power solar, battery or EV rebate.See the utility’s own pages

Financing. You can pay cash, borrow, or lease or sign a power purchase agreement, and each changes who gets any incentive. Ask any company offering a lease who claims what and what you pay in total. Compare the options in our buy versus lease guide.

A generator has never qualified for a federal credit. Rules and amounts change, so check each program page before you count on it, and talk to a tax professional about your own situation. Statewide detail: Ohio incentives table.

Compare energy solutions for your Cleveland home

Solar panelsHome batteryStandby generatorEV charger
Main purposeMake your own powerStore power; backup; peak shiftingMake power in an outageCharge a car at home
Typical cost (not Cleveland quotes)$2.58 a watt in Ohio (EnergySage)$16,900 for 13 kWh in Ohio (EnergySage)$8,000 to $16,000 installed incl. generator (Generac)About $800 to $3,000 before the charger (EnergySage)
Installation factorsRoof, shade, panel size, utility approvalLocation (heat), panel, program rules, permitsGas line or propane tank, pad, transfer switch, permitsPanel capacity, distance to panel, outdoor rating
Operating costNone; small inverter replacement laterNone; may earn utility paymentsFuel while it runsElectricity
MaintenanceOccasional cleaning and checksLittle; app monitoringOil and filter, annual inspection, exercise runsLittle
Financial benefitBill savings, mainly on power used at homeEvening-peak savings, any utility bonusNone; avoids loss during outagesLower fuel cost than gasoline
Backup in an outageOnly with a battery or special inverterYes, silent and automaticYes, for as long as fuel lastsNo (unless vehicle-to-home equipment)
Works well withBattery, EVSolar, EV overnightBattery for short outagesSolar, time-of-use plan

Common combinations in Cleveland: solar plus battery for bill savings and backup; battery plus generator for everyday outages and multi-day events; solar plus an EV charger on a time-of-use plan.

Cleveland energy permits, regulations and installation rules

ProjectCity permit officeUtility
SolarCity of Cleveland Department of Building and Housing. Solar is treated as an exterior alteration needing a building permit, and the city’s solar guide also calls for an electrical permit and structural drawings. Landmark and historic properties also need Landmarks Commission review.Interconnection approval before you switch on
Home batteryThe same office; ask whether a fire-department or placement rule applies to batteriesInterconnection approval; ask about battery requirements
GeneratorElectrical permit, and a gas or propane permit where requiredAsk the utility about transfer-switch rules
EV chargerElectrical permit from the same officeOptional rate plans or rebates

Find local energy installers and get quotes in Cleveland

We do not rank or rate companies. When you compare solar installers, battery installers, generator installers and EV charger installers in Cleveland, ask each bid to include:

  • License: a license you can check on the Ohio eLicense verification.
  • Sizing to your loads and your rate plan.
  • Itemized, written price: equipment models, permits, utility fees and what is excluded.
  • Warranty and service: who services the system if the installer closes.
  • Permits and inspections: who pulls them, and whether the utility paperwork is included.

Pick what you need, tell us about your home, and we will reply ourselves. Need more than one? Send a request for the first and mention the others in the message. Nothing is shared with an installer unless you choose one. We are lining up independent, licensed installers in the Cleveland area. Read how it works.

Get solar quotes

Free and no obligation. SolutionEnergy is an independent guide: we don’t install equipment ourselves; we help you understand your options and, if you want, connect you with installers who serve your area.

We use your details only for this request; see our privacy policy. Consent is not a condition of any purchase.

Cleveland energy FAQs

Which utility serves my Cleveland home?

It depends on your address. Cleveland Electric Illum and Cleveland Public Power serve different parts of Cuyahoga County. Check the top of your electric bill or ask the utility with your address.

Is solar worth it in Cleveland?

The sun is modest but real (about 1,060 kWh a year per kW of panels, our estimate). In Ohio, power you send to the grid earns only the energy part of your supply price, not the full retail rate, so solar pays best when sized to what you use yourself, up to 120 percent of your needs. The federal homeowner credit does not cover spending after 2025. See the Ohio incentives.

Is there a federal tax credit in 2026?

No. The 25D credit for solar and batteries ended for expenditures after December 31, 2025, the charger credit ended after June 30, 2026, and the EV purchase credit ended after September 30, 2025 (IRS). We found no Ohio state solar credit; the state sales-tax and property-tax treatment of home solar is not confirmed, so ask your installer.

Should I get a battery or a generator in Cleveland?

A battery is silent and automatic, works with solar and can save money at the evening peak. A generator keeps running as long as it has fuel and suits multi-day outages. Many homes choose a battery first; see the comparison table above.

How much does home battery installation cost in Cleveland?

EnergySage’s data shows about $16,900 for a 13 kWh battery in Ohio before incentives; local quotes differ.

What do I need to power my air conditioner in an outage?

It takes a large battery system or a standby generator, because starting a central air conditioner needs far more power than running it. Check your unit’s nameplate and consider a soft starter, or back up a window or mini-split unit instead.

How much does a home EV charger install cost?

EnergySage’s U.S. range is about $800 to $3,000 before the charger; your panel and wiring decide your price. AEP Ohio offers a residential time-of-use rate for standard-offer customers with a smart meter (on-peak 2 to 6 p.m. May to October); other Ohio utility EV rates were not confirmed.

Do I need a permit?

Usually yes for all four. City of Cleveland Department of Building and Housing handles permits in Cleveland. The utility must approve any system that connects to your wiring.

Does weather affect solar panels, batteries and generators?

Yes. Panels lose a little output when hot, many batteries reduce power in extreme heat or cold, and generators derate in heat. Pick equipment rated for Cleveland’s weather.

How do I choose an installer?

Ask for the contractor license number and look it up on the Ohio eLicense verification, get itemized written bids, make sure the installer sizes the system to your loads and your rate plan, and check warranty and service. We do not rank installers.

Cleveland energy resources

Sources and data checks

About the price and outage numbers at the top of this page: 2024 averages for each whole utility (EIA-861), not your plan or street. Outage time is a normal year without major storms. In the Texas retail-choice area the price shown is the state average, because the wires companies do not sell power.

Each linked guide lists its own sources and the items we could not confirm. We re-check these pages and welcome corrections.

WhatApplies toSourceCheckedStatus
Utility prices and outagesCleveland Electric Illum and Cleveland Public Power (whole utility, 2024)EIA Form 861October 21, 2026Verified
State price and rankOhioEIA Electric Power MonthlyOctober 21, 2026Verified (preliminary)
Sunshine and climateClevelandNASA POWEROctober 21, 2026Verified (our estimate of output)
HazardsCuyahoga CountyFEMA National Risk IndexOctober 21, 2026Verified
Public charging and fuel stationsClevelandAlternative Fuels Data CenterOctober 21, 2026Verified
Federal creditsU.S.IRSOctober 21, 2026Verified
City permitsClevelandCity of Cleveland Department of Building and HousingOctober 21, 2026Verified page; confirm details
CostsOhio, U.S.EnergySage; GeneracOctober 21, 2026Verified (not Cleveland quotes)

General information, not financial, tax, legal or electrical advice. Estimates are ours and are not promises. See our editorial policy.